How to calculate cost per unit

您所在的位置:网站首页 total variable cost怎么算 How to calculate cost per unit

How to calculate cost per unit

2024-03-01 16:34| 来源: 网络整理| 查看: 265

Cost per unit information is needed in order to set prices high enough to generate a profit. The cost per unit is derived from the variable costs and fixed costs incurred by a production process, divided by the number of units produced. Variable costs, such as direct materials, vary roughly in proportion to the number of units produced, though this cost should decline somewhat as unit volumes increase, due to greater volume discounts. Fixed costs, such as building rent, should remain unchanged no matter how many units are produced, though they can increase as the result of additional capacity being needed (known as a step cost, where the cost suddenly steps up to a higher level once a specific unit volume is reached). Examples of step costs are adding a new production facility or production equipment, adding a forklift, or adding a second or third shift. When a step cost is incurred, the total fixed cost will now incorporate the new step cost, which will increase the cost per unit. Depending on the size of the step cost increase, a manager may want to leave capacity where it is and instead outsource additional production, thereby avoiding the additional fixed cost. This is a prudent choice when the need for increased capacity is not clear.

Formula for the Cost per Unit

Within these restrictions, then, the cost per unit calculation is:

(Total fixed costs + Total variable costs) ÷ Total units produced

The cost per unit should decline as the number of units produced increases, primarily because the total fixed costs will be spread over a larger number of units (subject to the step costing issue noted above). Thus, the cost per unit is not constant.

Related AccountingTools Course

Cost Accounting Fundamentals



【本文地址】


今日新闻


推荐新闻


CopyRight 2018-2019 办公设备维修网 版权所有 豫ICP备15022753号-3